香蕉国产在线-香蕉国产线观看-香蕉国产人午夜视频在线观看-香蕉国产人午夜视频在线-香蕉国产精品偷在线播放-香蕉国产精品

How to use submersible pump for well to run normally

Date of issue:[2020-08-17]     Click through rate:    

Well submersible pump is mainly water immersion and oil immersion, both of which are composed of water pump and motor. In order to ensure the normal operation of the electric pump, it must be carried out according to the following methods.

1. Before using the electric pump, use a megohmmeter to check the insulation resistance of the motor, and the minimum value should not be less than 5 megohm. The inspection method is to connect a terminal on the megger to the cable line of the electric pump, and connect the other terminal to the motor shell. Shake the megger and observe the insulation resistance value.

2. Check the cable for ground cracks and scratches. If there is any damage, it should be replaced in time to prevent leakage.

3. The water immersion motor should open the irrigation bolt, fill with clean water, tighten the bolt, and then dive into the water. If oil leakage is found in the oil immersed motor, the sealing element should be replaced before diving into the water.

4. Before the electric pump submerges into the water, fill the pump with clean water, empty for 1-2 minutes, and start it twice to check whether the idling and starting are normal. If the direction is opposite, switch the two-phase wiring.

5. Check whether the lifting pipe has cracks and whether the connection is firm.

6. When the electric pump is submerged or lifted, the cable shall not be pulled to avoid cable damage or disconnection at the joint.

7. The power supply voltage should be controlled within 5% of the rated voltage. If the voltage is too high or too low, the motor will be damaged.

8. The electric pump shall be vertical when diving into the water, and shall not be inclined.

9. The electric pump shall not transport water or mud with more sand content. The sand particles in the motor cavity should be cleaned frequently and the clean water in the motor cavity should be replaced.

10. The actual head of the pump should be within 0.8-1 rated head. This can improve the working efficiency of the electric pump, save electricity, avoid overload operation of the motor, and prolong the service life.

11. After the pump is used, it should be cleaned, coated with oil on the metal surface to prevent rust, and keep it in a dry place vertically. Water immersion motor should also discharge clean water in the motor.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

主站蜘蛛池模板: yellow字幕网在线zmzz91 | 欧美办公室激情videos高清 | a片毛片在线免费看 | 无人区乱码区1卡2卡三卡在线 | 女人与d0gxxx | 日韩高清一区 | 日本www视频在线观看 | 国产一区二区精品久 | 国产精品久久免费 | 青青热久免费精品视频精品 | 亚洲娇小性hd | kk4444了欧美 | 鬼吹灯之天星术免费观看 | 欧美日韩在线成人看片a | 视频在线观看高清免费 | 99久久综合给久久精品 | 99精品热线在线观看免费视频 | 亚洲va天堂va国产va久久 | 国产一区二区三区毛片 | 第一福利在线观看永久视频 | 国产一区在线播放 | 小柔的性放荡羞辱日记动漫 | ipx358cn出差被男上司在线 | 毛片在线观看网站 | 精品无码国产污污污免费网站2 | 精品高潮呻吟99AV无码 | 日本一道一区二区免费看 | 亚洲麻豆精品果冻传媒 | 亚洲嫩模吧粉嫩粉嫩冒白浆 | 99r在线观看 | 全黄一级裸片视频免费 | 日韩成人在线影院 | 欧美人禽杂交狂配无删完整 | 91国内在线国内在线播放 | 欧美在线观看一区二区三 | 99热这里只有精品在线播放 | 亚洲国产成人在人网站天堂 | 白丝校花被扒开双腿喷水小说 | 国产欧美日韩一区二区三区在线 | 日本人做受全过程视频 | 变态人shou交小说 |